Welcome to DU!
The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards.
Join the community:
Create a free account
Support DU (and get rid of ads!):
Become a Star Member
Latest Breaking News
Editorials & Other Articles
General Discussion
The DU Lounge
All Forums
Issue Forums
Culture Forums
Alliance Forums
Region Forums
Support Forums
Help & Search
Veterans
Related: About this forumDDG 51 Multiyear Procurement Contract Awarded
http://www.navy.mil/submit/display.asp?story_id=74583DDG 51 Multiyear Procurement Contract Awarded
Story Number: NNS130603-25Release Date: 6/3/2013 8:53:00 PM
From Naval Sea Systems Command
Office of Corporate Communication
WASHINGTON (NNS) -- The Navy awarded two contracts for the DDG 51 fiscal years (FY) 2013-2017 multiyear procurement (MYP) for DDG 51 Arleigh Burke-class destroyers June 3.
General Dynamics Bath Iron Works (BIW) is being awarded a $2,843,385,450 fixed-price incentive firm target (FPIF) contract for the design and construction of four DDG 51 class ships, one in FY 2013 and one each in FY 2015-2017. This award also includes a contract option for a fifth ship.
Huntington Ingalls Industries (HII) is being awarded a $3,331,476,001 fixed-price-incentive firm target (FPIF) contract for the design and construction of five DDG 51 class ships, one each in FY 2013-2017.
These multiyear procurement awards are for a total of nine ships, with an option for a tenth ship. The Navy's objective is to procure the tenth ship as part of the planned FY 2013-2017 MYP. The Navy will work with Congress to resolve funding shortfalls resulting from sequestration reductions before contracting for the 10th ship.
"These contract awards represent great value to the taxpayer and will ensure our warfighters have the ships and systems they need to prevail in any situation," said Secretary of the Navy Ray Mabus. "By leveraging competition in the DDG 51 class shipbuilding program, these shipbuilders will continue their proud histories in delivering these highly capable ships to the fleet while meeting critical operational requirements for integrated air and missile defense capability."
A competitive allocation strategy used in the DDG 51 class shipbuilding program since 1996, known as profit related to offers, or PRO, uses FPIF contracts to ensure reasonable prices while maintaining the industrial base. Congressional approval for the use of MYP contracts facilitated program budget savings of more than $1.5 billion while enabling the shipbuilders and equipment manufacturers to more efficiently plan future workloads.
"I am proud of the success of the DDG 51 program and appreciate Congress' continued support and approval of the Navy's multiyear procurement request," said Mabus. "This award enables stability in our industrial base and ensures the Navy and the nation get the most efficient and affordable build plan for these destroyers."
The destroyers are being procured in a Flight IIA configuration, relying on a stable and mature infrastructure while increasing the ship's air and missile defense capabilities through spiral upgrades to the weapons and sensor suites.
The Navy plans to introduce the first DDG 51 Flight III on the second ship in FY 2016. Once Flight III requirements are approved, the new baseline will be implemented as an engineering change proposal. It is anticipated that the Flight III design will replace the Aegis AN/SPY-1D radar with the Air and Missile Defense Radar (AMDR) and provide for more electrical power and cooling capacity, providing the next generation of integrated air and missile defense and joint battle space awareness.
unhappycamper comment: "$2,843,385,450 fixed-price incentive firm target (FPIF) contract for the design and construction of four DDG 51 class ships",
DDG 51s cost around $1.8 billion dollars, delivered. (That's almost twice the cost of the Queen Mary II which comes in at $1 billion dollars..)
InfoView thread info, including edit history
TrashPut this thread in your Trash Can (My DU » Trash Can)
BookmarkAdd this thread to your Bookmarks (My DU » Bookmarks)
1 replies, 1584 views
ShareGet links to this post and/or share on social media
AlertAlert this post for a rule violation
PowersThere are no powers you can use on this post
EditCannot edit other people's posts
ReplyReply to this post
EditCannot edit other people's posts
Rec (0)
ReplyReply to this post
1 replies
= new reply since forum marked as read
Highlight:
NoneDon't highlight anything
5 newestHighlight 5 most recent replies
DDG 51 Multiyear Procurement Contract Awarded (Original Post)
unhappycamper
Jun 2013
OP
Angleae
(4,638 posts)1. From what I've learned on another board, this contract is for the hull only.
Engines, weapons, and electronics are not included.