Welcome to DU! The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards. Join the community: Create a free account Support DU (and get rid of ads!): Become a Star Member Latest Breaking News Editorials & Other Articles General Discussion The DU Lounge All Forums Issue Forums Culture Forums Alliance Forums Region Forums Support Forums Help & Search

unhappycamper

(60,364 posts)
Tue Oct 1, 2013, 05:51 AM Oct 2013

Report: Military Lost Control of F-35 Contractors, Errors Abound

http://abcnews.go.com/Blotter/report-military-lost-control-f35-contractors-errors-abound/story?id=20422344



Report: Military Lost Control of F-35 Contractors, Errors Abound
Sept. 30, 2013
By LEE FERRAN

The military's watchdog has found hundreds of flaws in the way giant defense contractors produced the F-35 fighter jet – flaws that made what was already the most expensive weapons system in history even more costly to American taxpayers and flaws that should have been caught by the program's military overseers.

The Department of Defense Inspector General released a 126-page report today describing 719 "issues" it found with the jet's primary manufacturer, Lockheed Martin, and five other major contractors as they assembled planes for the estimated nearly $400 billion F-35 Joint Strike Fighter program. It also listed failures of the F-35 Joint Program Office (JPO), the military-led organization in charge of putting the planes in the air for three services in the American military, for not ensuring "Lockheed Martin and its subcontractors were applying rigor to design, manufacturing, and quality assurance" among other things. Both Lockheed Martin and the JPO said the report was old news and that the issues have been mostly addressed.

Flaws found on the production line, according to the DOD IG, included "uncontrolled or unapproved" design changes in production planning, contractor personnel who were not following written manufacturing and assembly process instructions, inadequate calibration management systems that could hinder testing and employees with expired certifications for critical tasks like ejection seat installation or "explosives care."

Taken together, the DOD IG said the flaws "could adversely affect aircraft performance, reliability, maintainability, and ultimately program cost."
Latest Discussions»Issue Forums»Veterans»Report: Military Lost Con...